U.K. | Location: U.K. | Number of ACC Cells: 100 | Client: Damhead Creek Power Station | Scope of Work: General overhaul of the Air Cooled Condenser to improve performance of the 700 MW power station. The complete control logic was replaced and the entire system was de-bottlenecked. The ACC Team was instructed to perform a yearly cleaning (2008 onwards)